DIN 2393-2 St44.2 Dom or Precision Cold Drawn Welded or ERW Carbon Steel Tube

DIN 2393-2 St44.2 Dom or Precision Cold Drawn Welded or ERW Carbon Steel Tube

Part I: Generation INTRODUCTION
1. Commodity Description: Cold drawn ERW metal tube, also named DOM tubing, is a sort of drawn over mandrel welded steel tube. This sort of tube has excellent floor problem,concentricity,and high tensile power. 
two. Commodity: DIN 2393-two ST44.2 cold drawn welded metal tube

3. Dimensions range: 70mm*2mm-325mm*15mm

four. CZPT specification&steel grade:

ASTM/ASME: ASTM A512 MT1571,MT1571
EN: EN10305-two E195, E235,E355

five. Manufacture method: hydraulic cold drawn

six. Shipping condition:

BK BKW BKS GBK NBK
+C +LC +SR +A +N
Chilly rolled Cold drawn Pressure relieved Annealed Normalized

7. Conclude finish: simple ends with square cuts,free of charge of burrs.

8. Marking: as per request

nine. CZPT export packing: in bundles tied with steel strips. Int&ext oil coating. External packing by PVC baggage and knit bags.

ten. CZPTized packing and marking are CZPT on request.

Cold DRAWN ERW Steel TUBES: OIL Portray FOR ANTI-RUST Safety

Cold DRAWN ERW Metal TUBES: PACKING

 

Portion II: Often Asked Queries
1. MOQ: 
CZPTly, Min Buy Amount can be 1 ton/dimensions.
two. Shipping Time: CZPTly, our shipping and delivery time is all around 20-35 times relying on availability of uncooked content.
three. Guarantee&Promise: Warranty&guarantee period of time is 6 months considering that we deliver the tubes, and we are not responsible for good quality dilemma brought on by mistaken unloading or storage right after shipment. We welcome customer’s inspection prior to cargo. 
four. Payment Strategy: We acknowledge payment strategy like T/T, L/C, or D/P, but it is dependent on our investigation about clients. We have a solution to evaluate the credit of consumers from all more than the entire world, and time and volume of D/P we can release is decided by the evaluation. 
5. High quality Control: 90% of the tubes are made from very hot rolled seamless pipes. So, top quality of raw material identified high quality of concluded tubes. We obtain raw materials from steady suppliers who are top metal mills, and we inspect the uncooked material as for every the specifications. For the duration of our production method, there is inspection and top quality control in each stage.

Element III: Organization INTRODUCTION
We are a manufacturer of chilly drawn, cold rolled, and hydraulic chilly drawn steel tubes with OD upto 356mm given that 2002. Covering an spot of about 32000M2, we have twelve common workshops with  two hydraulic chilly drawing benches, 4 chain chilly drawing benches, and 2 ERW mills. Our services handles all the production methods from pickling, cold drawing,heat treating,noticed slicing, straightening,inspection,packing to even more machining &turning, cold drawing die fabrication, and products repairation&servicing.

Manufacturing facility Appearance:

Raw Materials Stock:

Cold DRAWING DIE WAREHOUSE:

HYDRAULIC Cold DRAWING:

MULTI-ROLLER SRAIGHTENING:

STRAIGHTENING BY Push: 

Noticed Chopping: 

LATHES: 

HONING:

 

DIN 2393-2 St44.2 Dom or Precision Cold Drawn Welded or ERW Carbon Steel Tube

TAGs: