CZPT Layer Flooring Deck Roll Forming Device
For YX45-982/YX50-955 Profile
Profile
Materials
Efficient width: 982/955 mm
Feeding width: about 1219/1219 mm
Substance Thickness: .7-1.two/.8-one.5mm
Relevant material:GI
With yield strength 235-390Mpa
CZPT Pre-Cutter
Principal Equipment
body frame produced from H450 type steel by welding
Facet wall thickness: Q235 t20mm
Embossing Rollers produced from Gcr15 Steel.
Rollers produced from 45# Steel,CNC lathes,Heat Treatment method,tough Chrome Coated
Gear/Sprocket driving,about 24-phase(Higher Layer)/24-phase(Down Layer) to form
Primary Motor=22KW*2,Frequency velocity manage
Chain: ZIQIANG (by China Prime 1 manufacturer XIHU (WEST LAKE) DIS.HUA Team)
All the screw bolts with grade 8.8
Genuine forming pace 18-twenty five m/min(Not contain cutting time)
Put up CZPT Slicing Device
Post to cut, quit to chopping,Three pieces sort of slicing blade style, no blanking
CZPT motor:eleven KW
Cutting device content: Cr12MoV
The cutting electrical power is supplied by the primary motor hydraulic station
PLC Control System
Input The Generation Information(Manufacturing Batch,pcs,Duration,and so forth.)On The Touch Display screen ,
It Can Finish The Production Immediately.
PLC:Siemens(Germany model)/Schneider(French brand name)
Inverter:Siemens(Germany brand name)/Schneider(French brand name)
7-Inch Colour Touch Display screen:Siemens(Germany manufacturer)/Schneider(French model)
Encoder: Omron (Japan brand)
Switch Base, Point out Mild, Electricity Offer, Intermediate Relay, AC Contactor,
Thermal Relay: Siemens(Germany model)/Schneider(French brand)
Air Switch: LG-LS(Korea manufacturer)
Lower-to-Size Tolerance≤±1 mm
Handle Voltage 24V
Product SAMPLE
Right after-Sale Provider
1. The warranty is 24 months after the client receives the machine.
Within The 24months, we will courier the replacement parts to the client
free of charge
two.We offer technical support for the entire life of our machines
3. We can send our technicians to install and train the workers in the clients’ factories with extra cost
Terms Of Trade
1.Minimum order quantity (MOQ): 1 Set
two.Delivery time: about 45 workdays
3.Port of loading: port of HangCZPT
four.Type of payment: by T/T or by L/C
5.Export:to more than sixty nations around the world and locations, like ZheJiang , British isles, France, Singapore,
Greece, Australia, USA, Mexico, Brazil, Chile, Xihu (West Lake) Dis.via, Trinidad, Israel, Saudi Arabia, and so forth
Packing Style
Packing approach: Main body of device is bare and coated by plastic film(to safeguard of dust and corrosion),
loaded into container and steadily fastened in container ideal by metal rope and lock, suitable for prolonged-distance transportation.
Creating time: about 50 workdays after received the advance payment
Packing strategy: with nude packing steadily fastened in one particular 40 feet container suited for
lengthy-length transportation
ABOUT US
Brand name FORMING CZPT CO.,LTD
HangCZPT BMS Developing Technology CO.,LTD(BMS)
EXHIBITION
Manufacturing unit
Certification
CZPTer
QUALITY IS OUR Lifestyle!
WITH US YOUR Money IN Safe,
YOUR BUINESS IN Risk-free!
IF U ARE Interested OUR MACHINES
PLEASE Contact WITH ME!