DESCRIPTION
YW collection Dissolved Air Floatation is largely for solid-liquid or liquid-liquid separation.Massive sum of micro bubbles created by dissolving and releasing program adhere to solid or liquid particles with very same density as squander h2o to make the whole float to the surface therefore accomplish the intention of sound-liquid or liquid-liquid separation.
Construction
Dissolved air system is composed of Air Dissolving System (dissolved air pump,air compressor,dissolved air tank,releaser and so forth.)air floatation tank,scraping technique(foam scraper reducer,chain,scraping board and so on).
Doing work Principle
Pollutants in wastewater can be divided into soluble organic and natural subject and the solubility material(SS),soluble organic issue beneath certain conditions,can be converted into a soluble compound,1 strategy sewage remedy is to join coagulants and flocculants to make most of soluble organic make a difference transform to the soluble substances,then remove all or most of the soluble compound(SS) removal in order to attain the objective of the sewage therapy,and the primary technique of removing SS is air flotation approach.Right after the chemical reaction,the wastewater enters the mixing zone,which is mixed with the dissolved air h2o after releasing,so that the flocs adhere to the small bubbles and then enter the air floating zone.The flocs would sort floating scum,the beneath cleanse water would circulation into the thoroughly clean h2o tank,a component of h2o reflux as dissolved air water,the other component of water overflows by way of overflow hole.When the scum on the h2o floor of the air float is gathered to a specific thickness,it is discharged from the sludge tank by the scraper.
Programs
1.Separation of oily(including emulsified) wastewater from petroleum,chemical and machanical procedures.
2.CZPTvery of sewage organic and natural subject.(this kind of as restoration of pulp fibers and fillers from paper mill wastewater)
three.Treatment method of wastewater with large chroma and minimal dissolved oxygen.This sort of as textile printing and dyeing wastewater treatment method.
four.Therapy of oxide-prosperous wastewater containing algae.
five.Therapy of reduced temperature and low turbidity sewage.
6.Exchange secondary sedimentation tank,appropriate for the circumstance that is easy to create sludge swellingIt is ideal for the concentration of residual activated sludge and handy for the therapy of filter push
Technological PARAMETER
Moedl | Managing capability (m3/h) |
Dissolved air drinking water quantity(m3/h) |
Dissolved air pump(kw) |
Foam scraper energy(kw) |
Air compressor energy(kw) |
Dissolved air tank dimension(mm) |
Dimension (mm) |
YW-05 | 4-5 | 1.5-2 | three | .fifty five | 1.five | Φ400*a thousand | 3300*1800*2200 |
YW-ten | eight-10 | two-three | 4 | .fifty five | one.5 | Φ500*1512 | 4000*2100*2200 |
YW-15 | 10-fifteen | four-six | 7.5 | .55 | 1.5 | Φ500*1512 | 4400*2100*2200 |
YW-twenty | fifteen-20 | five-7 | seven.5 | .55 | 1.5 | Φ500*1512 | 4600*2400*2200 |
YW-thirty | twenty-30 | six-ten | seven.five | .seventy five | 1.five | Φ500*1512 | 5200*2600*2400 |
YW-40 | 30-forty | eight-13 | seven.5 | .seventy five | 1.five | Φ600*1880 | 6000*2600*2400 |
YW-50 | forty-50 | 15-twenty | 7.5 | .seventy five | two.two | Φ600*1880 | 7000*2600*2400 |
YW-sixty | 50-60 | 18-27 | 11 | .75 | 2.2 | Φ600*1880 | 7600*2800*2400 |
YW-70 | sixty-70 | 22-30 | 11 | .75 | 2.two | Φ650*2034 | 8400*2800*2400 |
YW-80 | 70-eighty | 24-32 | eleven | 1.1 | 2.two | Φ650*2034 | 9200*2800*2400 |
YW-100 | ninety-100 | thirty-35 | 15 | 1.1 | 3 | Φ700*1980 | 10000*2800*2600 |
YW-a hundred and fifty | a hundred twenty five-150 | sixty-eighty | 22 | one.1 | 4 | Φ800*1980 | 13500*2800*2600 |
YW-200 | a hundred seventy five-200 | eighty-a hundred | thirty | one.one | 5.5 | Φ800-2100 | 15800*2800*2600 |
YW-250 | 225-250 | 110-120 | 37 | one.one | five.5 | Φ800*2400 | 18000*2800*2600 |
YW-300 | 280-300 | one hundred twenty-a hundred and eighty | 37 | one.one | 5.five | Φ1000*2900 | 19200*3400*2800 |
DAF can be divided 5,ten,20,thirty,40,50,60,80,one hundred,a hundred and fifty,two hundred,250,three hundred m3/h by ability,also can be CZPT by clients’ needs.
Remedy Guidance: Installation &. Procedure Xihu (West Lake) Dis..
You can give us the drinking water resources, water good quality, movement charge and floor region, substance specifications about your venture, then more complex answers will be recommended to you.
Why choose us
1. We constant excellent good quality with realistic cost.
2. Huge firm, excellent reputation, far more reputable.
3. Delivery in time.
four. Over 15 years’ expertise given that 2006.
five.Appreciable after-product sales service.
Our Providers
one.24-hour a day, 365-day a year accessibility to a toll-free health treatment professional hotline for queries and difficulties-shooting support FREELY.
two.all year spherical on web site set up and debugging services abroad with expert engineer manual and coaching.
Packaging & Delivery
Packaging Details Seaworthy package deal
Shipping Time Within twenty days soon after receipt of deposit
FAQ
one.Q:Are you a factory or investing firm?
A: We are a factory, we have abundant expertise for manufacuring water processing products for more than 10 many years.
two.Q:Exactly where is your manufacturing facility found? How can i visit there?
A: Our manufacturing facility is positioned in No.1137 Guanhai road , HangCZPT CZPT, ZheJiang Province, China. It is about 2 hours from HangCZPT airport. We can select you up if you need to have, welcome to visit our manufacturing facility.
three.Q: Do you have minimum buy quantity ask for?
A: No bare minimum get, but it can get a discount if you buy a large amount.
four.Q: Do you have certificates?
A: Indeed, we have ISO,SGS certification.
five.Q: Can you fulfill my unique specifications for my items?
A: Of course, we have a professional design team. We can supply drawings in accordance to your specifications.
6. Q:How to get your thought products?
A:You can offer us your h2o resources, drinking water quality, movement price and ground spot (link us for far more details).
7. Q:How to spend?
A: TT and L/C are acceptable and TT will be much more appreciated. thirty% deposit before making, 70% harmony ahead of loading by TT.
eight. Q:What is the delivery time?
A: It is dependent on buy portions. CZPTly speaking, the supply time will be inside 4 to 6 weeks.
nine. Q: How to pack the goods?
A: We use normal package. If you have specific package specifications, we will pack as needed, but the charges will be compensated by customers.
10. Q: How to hold your equipments from corrosion?
A: We use the globe-popular paint, like SigmaCoatings,PainBow,etc. What is actually more, we paint strictly in accordance to the regular method.
eleven. Q: How do you manufacture your equipment ?
A:Our machining technology includes laser/plasma slicing, automated welding,CNC chopping and bending.
twelve. Q:How to put in after the equipments arriving location?
A: We will supply detailed illustrations to you. If it is needed, we will send out technicians to support you. Nonetheless, the visa charge, air tickets, accommodation, wages will be paid out by buyers.