Small Scale Mineral Water Filling Machine

Small Scale Mineral Water Filling Machine

Generation Introduction

This CGF Clean-filling-capping 3-in-1unit: Beverage CZPT is utilized to generate polyester bottled mineral water, purified h2o, alcoholic beverage equipment and other non-fuel beverage equipment. Beverage CZPT can finish all the method this kind of as washing bottle, filling and sealing, it can reduce the materials and Outsiders contact time, increase the sanitary situations, production potential and financial effectiveness.
The Comprehensive Bottled Mineral Water / Pure Water Creation Line utilized in the beverage filling functions. The three capabilities of bottlewash, fill and seal are composed in 1 physique of the device. The entire procedure is automated.
 

Washing heads

The rotary disk is completely created of SUS304 stainless steel. 
Making use of imported specific productive spray nozzle, the washing water will be sprayed in a distinct angle, can clean any component of the interior wall, rinse with water totally and save flush bottle.
Bottle clamp and lifting mechanism of sliding sleeve adopts Germany Igus corrosion resistant bearing CZPT upkeep.
Washing element moves by a frame in the transmission technique via the gear transmission.

Filling heads

The washing bottle, filling, sealing are connecting with the thumbwheel card bottleneck transportation techniques.
The rotating disk is all made of SUS304 stainless.
Filling technique is fravity filling.
Filling valve made by SUS304.
The filling valve composition design is reasonable, the filling amount is exact.

Capping heads

The capping equipment is the highest precision in 3-in-1 unit equipment, on the dependability of gear procedure, has tremendous influence on the defective fee of the solution.Released the world’s most innovative Italian AROL capping device technology, combining with the filling machine production encounter improvement, and question university of ZheJiang Jiao Tong university mechanical engineering institute of electrical and mechanical style and automation technologies of specialists and professors to assist design and style. 

Major Functions

one. Employing the wind sent obtain and transfer wheel in the bottle directly related engineering canceled screw and conveyor chains, this permit the alter the bottle-shaped turn into less difficult. 

two. Bottles transmission undertake clip bottleneck technologies, bottle-formed rework not need to modify the equipment stage, only alter connected the curved plate, wheel and nylon parts is ample.. 

three. The specifically designed stainless metal bottle washing device clip is reliable and tough, no contact with the screw spot of bottle mouth to avoid secondary pollution. 

four. Substantial-pace big gravity circulation valve filling valve, filling quickly, filling exact and no liquid drop. 

five. Spiraling drop when output bottle, remodel bottle shape no want to adjust the peak of conveyor chains. 

6. Host undertake advanced PLC computerized handle engineering, the important electrical parts from popular company this kind of as Japan’s Mitsubishi, France Schneider, OMRON.

A lot more designs

Washing, filling, capping heads 14-12-four 18-18-six 24-24-8 32-32-8
Capacity based on 500ml 3000-4000 BPH 5000-7000 BPH 8000-12000 BPH 12000-15000 BPH
Applicable bottle H=one hundred seventy-320, Φ=fifty-one hundred, (330∼2000ml)
Pressure  .twenty five-.three MPA
CZPT power  one.5+.37 KW two.two+.37 KW three+.45+.twenty five KW 4+.45+.25 KW
Total dimension 2300×1680×2650 2500×1760×2650 3100×2100×2650 3800×2800×2650
Fat 2600 KG 3500 KG 4800 KG 6500 KG

Auxiliary equipment
 

RO h2o treatment technique

We adopt various gear to produce pure water, mineral h2o and so forth. The primary equipment of RO Drinking water Treatment method Plant are silica sand filter, energetic carbon filter, sodium ion exchanger, hollow fiber, RO( reverse osmosis), UV sterilizer, precision filter, ozone generator, water tank and many others.  It can efficiently get rid of muddy organic issue, iron, manganese and many others, lessen the hardness of the drinking water to make all technical specs of the water quality completely satisfy the state clean water regular of clean consume water.

Blow molding system

1. Exceptional Mechanical Strength, effect-resisting, and non-craking. 
two. Bottle mouth and thread are of specific measurement.
three. CZPT Drugs Bottle’s protected thread can be molding directly.
4. The dimension and weight of the solution can compute and design and style obviously and fulfill the requirement of the design CZPT any deviation. 
five. The surface of the bottle mouth, neck and the entire body is great luster and smoothness, the standard of bottle body is unity. 
six. The joint seam on the bottle human body is clean, no scrap rubber. 

Computerized labeling equipment

1. Shrink Labeling Equipment For Sleeve adpots PLC programmable controller,imported servo motor,servo driver, frequency converter and transducer.
two. Shrink Labeling Machine For Sleeve adopts the positioning module to guarantee the casting label exact,rapid and steady.
three. Our Shrink Labeling Machine For Sleeve not only has a extremely specific placement for casting label, but also stand up to the best form of the bottle following shrinkage.

PE film packaging device

Computerized PE film warmth shrink wrapping equipment is suited for wrapping of such products as pop prime, mineral h2o , bottles. beer, beverages and many others. Doing work with PE movie shrink tunnel to pack the merchandise flawlessly , the total manufacturing procedure adopts the Germany innovative technics, and the primary parts are imported from international popular organizations. It consists of 7 actuating motor, by means of cooperation with seven actuating motor to sort the merchandise packed with plastic film and numerous bottles as a group out from the hot shrinking packing device.

King Device

CZPTized workshop of complete 12,000 sq. meters.
Different kinds of processing units, this kind of as h2o jet cutter, plasma cutter, laser cutter, CNC equipment from ZheJiang chevalier & korea daewoo, make certain the precision of parts.

CZPT certification, National Certificate of products verification, and much more than 30 creation patents are done in King equipment .
Verification Certificates of equipments: CZPT:2001 CE Certification , SGS , COC , TUV
National Certificate of products verification:normal organisation of Nigeria , CNCA certificate, Brand trademark registration, etc.

The products will be tested and run for 24 hours just before leaving the factory, to make certain the easy operating of water pipeline, and pneumatic, electrical and mechnical security.

Sufficient stock of spare elements ensures the well timed shipping and source of spare parts.

The engineers are seasoned. We can produce various items with distinct ability and operate out sensible stream chart as for every customers’ specifications to help save place.

Expert installation group who can talk fluent English can aid buyers make advantages in a shortest time.

King Equipment

one. Set up, debug
Soon after products attained the workshop of customer, location the gear according to plane layout we provided. We will organize seasoned technician for tools installation, debug and take a look at production at the exact same time make the gear attain the rated producing ability of the line. The purchaser need to offer the spherical tickets and lodging of our engineer, and the wage.

2. Coaching
Our company offer you technologies education to client. The material of instruction is framework and upkeep of products, management and operation of gear. Seasoned technician will guidebook and build coaching define. After instruction, the technician of consumer could learn the operation and servicing, could alter the process and handle different failures. 

3. High quality guarantee
We guarantee that our items are all new and not utilized. They are manufactured of appropriate materials, adopt new style. The high quality, specification and function all satisfy the demand of agreement. We promise that the goods of this line could storage for one particular calendar year CZPT introducing any aseptic.

four. Soon after sales
After checking, we offer you 12 months as high quality assure, free offer you donning areas and offer you other areas at the least expensive value. In quality guarantee, the technician of consumers ought to operate and preserve the equipment according to seller’s need, debug some failures. If you could not solve the problems, we will guide you by phone if the difficulties are still can not solve, we will arrange technician to your factory fixing the issues. The expense of technician arrangement you could see the value remedy strategy of technician. 

Soon after top quality assure, we offer engineering assistance and following sales provider. Offer you donning parts and other spare components at favorable price following quality guarantee, the technician of customers need to run and preserve the gear in accordance to seller’s demand, debug some failures. If you could not remedy the difficulties, we will guidebook you by mobile phone if the issues are even now can not remedy, we will set up technician to your factory resolving the problems.

FAQ

Q1: Do you have reference task?
A1: We have reference venture in most countries,If we get the authorization of the consumer who has introduced the devices from us ,we can inform you their get in touch with imformation,you can go to vist their manufacturing unit.
And you are constantly welcome to arrive to go to our company,and see the equipment working in our manufacturing unit,we can select you up from the station around our city.
Make contact with our income people you can get online video of our reference operating device

Q2: Do you have agent and right after-support stations?
A2: So far we have agent in Yemen,Nigeria,Dubai,India,Kenya,Dubai welcome to join us!

Q3: Do you provide CZPT support
A3: We can design the devices in accordance your needs(materil ,energy,filling variety,the kinds of the bottles,and so on),at the identical time we will give you our skilled recommendation,as you know,we have been in this business for numerous many years.

Q4: What is actually your guarantee or the guarantee of the top quality if we get your devices?
A4: We offer you high quality machines with one yr guarantee and offer life-extended complex assist.

Q5: How long time for set up?
A5: According your devices order,we will deliver one particular or two engineers to your plant,it will take about ten days to twenty five times.

Please feel free of charge to speak to with me:
HangCZPT King Device Co.,Ltd
Insert: NO.22 East Seven Road Xihu (West Lake) Dis.lai Town, HangCZPT CZPT, ZheJiang Province, China
website:  

 

Small Scale Mineral Water Filling Machine

TAGs: